Basis
2 - K- epoxy resin
Consumption
2 x 400 – 500 g/m² (Double priming, to be sprinkled with quartz sand 0,3 – 0,8 mm grain size after the first priming (approx. 0,5kg/m²))
Material temperature
Minimum +15°C
Processable-/pot life
at +8°C approx. 40 mins.,
at +23°C approx. 25 mins.,
at +30°C approx. 15 mins.
Hardening time (walkable)
at +8°C approx. 24 h.,
at +23°C approx. 12 h.,
at +30°C approx. 6 h.
Waiting time before the next working process:
At +8°C min. 16 h to max. 36 h,
At +23°C min. 6 h to max. 24 h,
At +30°C min. 3 h to max. 12 h
(After this time, further processing with
sealing or coating is possible)
Packaging size
4,35 kg (component A), 1,65 kg (component B)
Minimum working temperature
At least +8°C to max. +30°C (Temperature of the building site)
Cleaning in fresh condition
WIDOPAN - Cleaner
Storage
If container is kept closed and storage temperature held constantly between +15°C and +25°C, the product may be used for up to 12 months.
Surface preparation
The surface to be primed needs to be dry, free from dust, grease and oil as well as absorbent and loadable. Loose or high lying tiles must be removed. Metal surfaces must be prepared corrosion-free by grinding or blast-cleaning.
The special priming must be applied comprehensive, as a closed film and is generally sprinkled with quartz sand of grain size 0,3 – 0,8 mm. If this cannot be achieved within one working process, a second layer of priming has to be applied. Wet concrete surfaces may be matt damp but must not show a layer of water resp. porewaer.
Wet concrete surfaces can be slightly damp but should not have a visible water film or pore water.
Processing as scratch coat
When producing a scratch coat with WIDOPOX, the surface needs to be primed with a consumption of approx. 400g to 500g /m² and sprinkled with quartz sand of grain size 0,3 to 0,8 mm. For the scratch coat, approx. 0,75 kg/m² WIDOPOX is mixed with quartz sand of grain size 0,1 to 0,3 mm with a mixing ration of 1:0,8 to 1:1.
Temperatures of <+10° C may result in crystallization!
Resistant to mastic asphalt up to +250C°.
Further details, especially regarding hazard statements, security advices and measures in the event of fire can be found in the safety data sheet under sections 2, 4, 5, 6, 7 and 8.
Please also refer to our instructions on priming and to our technical information sheets!
Important note:
Priming and sealing may only be processed at stable or decreasing temperatures. Otherwise, bubbles may occur and the sealing/priming might be leaking.
Download pdf